|
|
|||||
|
INSTALLATION EQUIPMENT
EAB pipe and spool Installation equipment is tailored to the various Termination heads on the market. This family of tools works individually or together attached to the Termination heads of rigid or flexible flowlines, spools and risers. The FLT Flowline lifting tool is used in one or both ends during launching of pipe- or flexible lines under tension. The FLT is also used to pick up lines that have to be retrieved. The EAB Subsea Pig Launchers and Receivers are used under commissioning and pressure testing after installation. The EAB Temporary ROV operable clamp is available for the most common hub profiles. The clamp is used for pressure caps or fitting the EAB Pig Trap to the actual Termination head. The clamp has high capacity to take installation forces and internal pressure. These products are now standardised based on years of experience and feedback from the users. EAB Softlanding cylinders are water based and offer 100% response to hook motions and need no external connections. A large capacity range of standard cylinders is available. |
||||
|
EAB Engineering AS | Strandgata 13C | NO-2815 Gjøvik |
Norway |
Phone: +47 61 13 91 50 | Fax: +47 61 13 91 51 | E-mail: eab@eabeng.no
Design: maritimecolours.no Powered by PublishOnline™ |
|||||